APPENDIX 18  Cost Estimate

A18.1      Unit Rates

Item

Description

Cost/Unit

Unit

 

 

€/unit

 

100

General

 

 

 

Cross-Section

 

 

 

Total Length

 

 

 

 

 

 

200

Site Clearance

 

 

200/01

Assume 40 metre wide corridor

10.16

€/lin m

 

 

 

 

300

Fences

 

 

300/01

Fencing

88.88

€/lin m

 

 

 

 

400

Safety Fencing

 

 

400/01

Safety Fence double sided

168.88

€/lin m

400/02

Safety Fence single sided

76.18

€/lin m

400/03

Open Box Beam

0.00

IR£/lin m

400/04

Concrete Safety Barrier

0.00

IR£/lin m

 

 

 

 

500

Drainage

 

 

 

Total Drainage Requirement

 

 

 

 

 

 

 

French Drain

 

 

500/01

225mm dia. < 1.5m

36.82

€/lin m

500/02

225mm dia. < 2.0m

45.71

€/lin m

500/03

300mm dia. < 1.5m

48.25

€/lin m

500/04

300mm dia. < 2.1m

54.60

€/lin m

500/05

375mm dia. < 1.5m

48.25

€/lin m

500/06

600mm dia. < 1.5m

88.88

€/lin m

500/07

600mm dia. < 2.0m

114.28

€/lin m

 

 

 

 

 

Manholes

 

 

500/08

Type A < 2m

698.36

€/No.

500/09

Type B < 2m

698.36

€/No.

500/10

Type D < 2m

698.36

€/No.

 

 

 

 

 

Interceptor Ditches

 

 

500/11

As per RCD/05/021

8.53

€/lin m

 

 

 

 

 

Pipework

 

 

500/12

225mm dia. < 1.5m

39.36

€/lin m

500/13

225mm dia. < 2.0m

43.17

€/lin m

500/14

300mm dia. < 1.5m

57.14

€/lin m

500/15

300mm dia. < 3.0m

67.30

€/lin m

500/16

375mm dia. < 1.5m

71.11

€/lin m

500/17

375mm dia. < 2.0m

85.07

€/lin m

500/18

600mm dia. < 1.5m

130.78

€/lin m

500/19

600mm dia. < 2.1m

156.18

€/lin m

500/20

900mm dia. < 1.5m

251.41

€/lin m

500/21

900mm dia. < 3.3m

279.34

€/lin m

500/22

1050mm dia.

314.90

€/lin m

 

 

 

 

 

Excavation

 

 

600/01

Excavate Topsoil

3.17

€/cu m

600/02

Excavate Suitable Material

3.17

€/cu m

600/03

Excavate Unsuitable Material

2.16

€/cu m

600/04

Excavate Rock

7.62

€/cu m

600/05

Excavate Hard Rock

10.16

€/cu m

 

 

 

 

 

Deposition of Fill

 

 

600/06

Deposit Suitable Material

1.08

€/cu m

600/07

Deposit Rock fill Material

1.40

€/cu m

 

 

 

 

 

Disposal of Material

 

 

600/08

Disposal of Unsuitable

1.90

€/cu m

600/09

Disposal of Topsoil

 

€/cu m

 

 

 

 

 

Imported Fill

 

 

600/10

Imported Fill

8.25

€/cu m

 

 

 

 

 

Compaction of Fill

 

 

600/11

Compaction of Fill

0.33

€/cu m

 

 

 

 

 

Completion of Formation

 

 

600/12

Completion of Formation (sc)

3.72

€/lin m

600/13

Completion of Formation (ws)

4.47

€/lin m

600/14

Completion of Formation (dc)

6.42

€/lin m

 

 

 

 

 

Capping

 

 

600/15

Capping (incl. Compaction) sc

100.49

€/lin m

600/16

Capping (incl. Compaction) ws

120.88

€/lin m

600/17

Capping (incl. Compaction) dc

173.76

€/lin m

 

 

 

 

 

Landscaping

 

 

600/18

Soiling (150mm)

12.06

€/lin m

600/19

Seeding

6.03

€/lin m

 

 

 

 

900

Pavement (standard single)

 

 

900/01

Sub-base (Cl 804) - 150mm

41.39

€/lin m

900/02

Roadbase - 230mm

245.20

€/lin m

900/03

Basecourse - 60mm (incl. Bit. Spray)

98.39

€/lin m

900/04

Wearing course - 50mm

89.02

€/lin m

 

 

 

 

 

Pavement (wide single)

 

 

900/01

Sub-base (Cl 804) - 150mm

51.74

€/lin m

900/02

Roadbase - 230mm

299.02

€/lin m

900/03

Basecourse - 60mm (incl. Bit. Spray)

119.99

€/lin m

900/04

Wearing course - 50mm

108.56

€/lin m

 

 

 

 

 

Pavement (dual carriageway)

 

 

900/05

Sub-base (Cl 804) - 150mm

72.44

€/lin m

900/06

Roadbase - 260mm

438.57

€/lin m

900/07

Basecourse - 60mm (incl. Bit. Spray)

175.99

€/lin m

900/08

Wearing course - 50mm

159.23

€/lin m

 

 

 

 

1100

Kerbs and Footways

 

 

1100/01

Kerbing

2.20

€/lin m

1100/02

Footways

8.89

€/lin m

 

 

 

 

1200

Signs & Road Markings

 

 

1200/01

Signs & Road Markings

2% of total except land & structures

 

 

 

 

1300

Road Lighting

 

 

1300/01

Road Lighting

1% of total except land & structures

 

 

 

 

1400

Electrical Work

 

 

1400/01

Electrical Work

1% of total except land & structures

 

 

 

 

1700

Structures

 

 

1700/01

Reservoir Crossings

3174.35

€/sq m

1700/02

Overbridges (minor road)

1587.17

€/sq m

1700/03

Underbridges (minor road)

1587.17

€/sq m

1700/04

River Crossing say 20m span

1587.17

€/sq m

1700/05

Culvert 1 x 0.9m dia.

793.59

€/lin m

1700/06

Culvert 3 x 0.9m dia.

793.59

€/lin m

1700/07

Culvert 2 x 1.5m box

888.82

€/lin m

1700/08

Culvert 3 x 2.4m box

952.30

€/lin m

 

 

 

 

2600

Junctions and Intersections

 

 

2600/01

Roundabout (ICD > 30 metres)

1047533.93

€/No.

2600/02

Compact GSJ

1650659.53

€/No.

2600/03

Priority Junctions (Ghost Islands)

158717.26

€/No.

2600/04

Side Roads / link Roads

1523.69

€/No.

 

 

 

 

2700

 

 

 

2700/01

Accommodation Works

3% of total except land & structures

2700/02

Statutory Undertakers Diversion

5% of total except land & structures

2700/03

Traffic Management

To be assessed individually

2700/04

Preliminaries

15% of total except land

 

 

 

 

 

 

 

A18.2      Breakdown of Costs – Dual Carriageway Option for Yellow and Blue Routes Macroom to Ballincollig

Item

Description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G/01

G/02

G/03

G/04

G/04a

G/05

G/06

G/07

Y/01

Y/02

Y/03

Y/04

Y/05

Y/05a

Y/06

Y/06a

Y/07

Y/08

Y/09

Y/10

Y/11

R/01

R/02

R/03

B/01

B/02

B/03

B/04

L1/01

L3/01

L4/01

L6/01

100

General

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cross-Section

sc

sc

sc

sc

ws

ws

ws

ws

sc

sc

sc

sc

sc

ws

ws

ws

dc

dc

dc

dc

dc

ws

ws

ws

dc

dc

dc

dc

sc

ws

dc

dc

 

Total Length (km)

1.506

0.518

6.578

4.956

3.155

6.047

16.108

2.095

0.589

0.516

3.762

8.652

1.582

1.646

1.947

0.928

5.26

5.211

9.087

4.284

0.333

0.954

9.504

9.151

8.049

1.261

10.622

2.967

5.363

6.601

3.834

1.449

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200

Site Clearance

15

5

67

50

32

61

164

21

6

5

38

88

16

17

20

9

53

53

92

44

3

10

97

93

82

13

108

30

54

67

39

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300

Fences

134

46

585

440

280

537

1432

186

52

46

334

769

141

146

173

82

468

463

808

381

30

85

845

813

715

112

944

264

477

587

341

129

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

400

Safety Fencing

114

85

565

149

376

83

595

156

0

41

105

329

55

41

67

94

1214

1104

1981

791

56

69

663

680

1918

422

2292

562

156

565

1026

258

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

500

Drainage

165

12

681

813

209

1135

2427

242

152

49

622

1314

268

315

307

79

722

787

1372

801

67

97

1168

1064

985

52

1667

525

899

634

352

277

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

600

Earthworks

442

499

5435

1584

2137

1417

7277

1525

1472

375

915

3683

701

1270

1146

595

4443

4892

3427

1781

84

1084

7734

5431

4683

902

4218

907

1848

4383

3613

1350

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

900

Pavement

714

246

3118

2349

1828

3503

9332

1214

279

245

1783

4101

750

954

1128

538

4451

4410

7690

3625

282

553

5506

5301

6811

1067

8989

2511

2542

3824

3244

1226

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1100

Kerbs and Footways

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1200

Signs & Road Markings

64

18

275

135

168

180

617

67

80

15

134

259

60

128

117

59

264

304

395

203

10

59

445

323

359

70

507

133

146

253

191

83

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1300

Road Lighting

32

9

138

68

84

90

309

33

40

8

67

129

30

64

59

30

132

152

198

102

5

29

222

161

179

35

254

66

73

126

95

42

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1400

Electrical Work

32

9

138

68

84

90

309

33

40

8

67

129

30

64

59

30

132

152

198

102

5

29

222

161

179

35

254

66

73

126

95

42

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1700

Structures

69

635

2084

869

669

1397

27961

2095

0

0

1215

2061

332

1330

794

635

20920

2859

6096

3635

0

0

16268

4832

26085

2497

9495

1841

1789

14015

4173

921

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2600

Junctions and Intersections

1596

0

3301

1381

3530

2279

9631

0

2038

0

2924

2663

1048

3638

3028

1566

1828

3479

4393

2743

0

1048

6222

2743

2743

914

7136

1828

1323

2565

914

914

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2700

Accommodation Works/Statutory

761

306

3558

1727

2081

2338

11477

1103

944

179

1769

3365

753

1705

1504

794

6248

4013

5578

2944

123

695

7688

4530

8146

1196

7408

1840

1991

5082

2875

1122

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Total

4138

1869

19943

9634

11478

13112

71530

6676

5103

970

9975

18891

4182

9671

8401

4511

40875

22667

32227

17151

666

3759

47079

26133

52886

7315

43271

10574

11372

32227

16958

6378

 

10% contingency

414

187

1994

963

1148

1311

7153

668

510

97

998

1889

418

967

840

451

4088

2267

3223

1715

67

376

4708

2613

5289

732

4327

1057

1137

3223

1696

638

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Construction Cost

4551

2056

21937

10597

12625

14424

78683

7344

5613

1067

10973

20780

4600

10638

9241

4962

44963

24934

35450

18866

732

4135

51787

28746

58174

8047

47598

11631

12509

35449

18654

7015

 

Construction Cost/kilometre

3022

3969

3335

2138

4002

2385

4885

3505

9530

2068

2917

2402

2908

6463

4746

5347

8548

4785

3901

4404

2199

4334

5449

3141

7227

6381

4481

3920

2332

5370

4866

4842

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5000

Land Acquisition

432

130

2293

1473

1041

2635

6891

1354

216

65

761

1775

203

356

356

178

1606

1835

2082

2021

61

1003

3714

4411

4057

381

4203

965

1860

2906

1524

609

 

NOTE:  Amounts shown are in Thousands of Euro (€ / 1000)

 

A18.3      Breakdown of Costs – Two-Lane Wide Single Carriageway Option for Yellow and Blue Routes Macroom to Ballincollig

Item

Description

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G/01

G/02

G/03

G/04

G/04a

G/05

G/06

G/07

Y/01

Y/02

Y/03

Y/04

Y/05

Y/05a

Y/06

Y/06a

Y/07

Y/08

Y/09

Y/10

Y/11

R/01

R/02

R/03

B/01

B/02

B/03

B/04

L1/01

L3/01

L4/01

L6/01

100

General

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cross-Section

sc

sc

sc

sc

ws

ws

ws

ws

sc

sc

sc

sc

sc

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

ws

sc

ws

ws

ws

 

Total Length (km)

1.506

0.518

6.578

4.956

3.155

6.047

16.108

2.095

0.589

0.516

3.762

8.652

1.582

1.646

1.947

0.928

5.26

5.211

9.087

4.284

0.333

0.954

9.504

9.151

8.049

1.261

10.622

2.967

5.363

6.601

3.834

1.449

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

200

Site Clearance

15

5

67

50

32

61

164

21

6

5

38

88

16

17

20

9

53

53

92

44

3

10

97

93

82

13

108

30

54

67

39

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

300

Fences

134

46

585

440

280

537

1432

186

52

46

334

769

141

146

173

82

468

463

808

381

30

85

845

813

715

112

944

264

477

587

341

129

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

400

Safety Fencing

114

85

565

149

376

83

595

156

0

41

105

329

55

41

67

94

326

224

446

68

0

69

663

680

559

209

499

60

156

565

378

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

500

Drainage

165

12

681

813

209

1135

2427

242

152

49

622

1314

268

315

307

79

722

787

1372

801

67

97

1168

1064

985

52

1667

525

899

634

352

277

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

600

Earthworks

442

499

5435

1584

2137

1417

7277

1525

1472

375

915

3683

701

1270

1146

595

3815

4220

2766

1453

64

1084

7734

5431

3933

768

3424

713

1848

4383

3118

1164

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

900

Pavement

714

246

3118

2349

1828

3503

9332

1214

279

245

1783

4101

750

954

1128

538

3047

3019

5264

2482

193

553

5506

5301

4663

731

6154

1719

2542

3824

2221

839

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1100

Kerbs and Footways

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1200

Signs & Road Markings

64

18

275

135

168

180

617

67

80

15

134

259

60

128

117

59

205

245

303

159

7

59

445

323

274

56

399

103

146

253

147

67

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1300

Road Lighting

32

9

138

68

84

90

309

33

40

8

67

129

30

64

59

30

103

122

151

80

4

29

222

161

137

28

199

51

73

126

74

34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1400

Electrical Work

32

9

138

68

84

90

309

33

40

8

67

129

30

64

59

30

103

122

151

80

4

29

222

161

137

28

199

51

73

126

74

34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1700

Structures

69

635

2084

869

669

1397

27961

2095

0

0

1215

2061

332

1330

794

635

20920

2859

6096

3635

0

0

16268

4832

26085

2497

9495

1841

1789

14015

4173

921

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2600

Junctions and Intersections

1596

0

3301

1381

3530

2279

9631

0

2038

0

2924

2663

1048

3638

3028

1566

1828

3479

4393

2743

0

1048

6222

2743

2743

914

7136

1828

1323

2565

914

914

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2700

Accommodation Works/Statutory

761

306

3558

1727

2081

2338

11477

1103

944

179

1769

3365

753

1705

1504

794

5559

3319

4488

2426

84

695

7688

4530

7141

1035

6128

1489

1991

5082

2364

929

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Sub-Total

4138

1869

19943

9634

11478

13112

71530

6676

5103

970

9975

18891

4182

9671

8401

4511

37149

18913

26331

14351

455

3759

47079

26133

47453

6443

36352

8676

11372

32227

14194

5335

 

10% contingency

414

187

1994

963

1148

1311

7153

668

510

97

998

1889

418

967

840

451

3715

1891

2633

1435

45

376

4708

2613

4745

644

3635

868

1137

3223

1419

533

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total Construction Cost

4551

2056

21937

10597

12625

14424

78683

7344

5613

1067

10973

20780

4600

10638

9241

4962

40863

20804

28964

15786

500

4135

51787

28746

52198

7087

39987

9543

12509

35449

15614

5868

 

Construction Cost/kilometre

3022

3969

3335

2138

4002

2385

4885

3505

9530

2068

2917

2402

2908

6463

4746

5347

7769

3992

3187

3685

1503

4334

5449

3141

6485

5620

3765

3216

2332

5370

4072

4050

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5000

Land Acquisition

432

130

2293

1473

1041

2635

6891

1354

216

65

761

1775

203

356

356

178

1606

1835

2082

2021

61

1003

3714

4411

4057

381

4203

965

1860

2906

1524

609

 

NOTE:  Amounts shown are in Thousands of Euro (€ / 1000)

 

Back to Chapter 18       To Appendices