N71 Ballinhassig Junction Scheme Completed
View
Map:
Status:Completed
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 Victoria Cross Scheme At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N28 Ringaskiddy Pedestrian Crossing At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N71 Bohonagh Junction Scheme At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N71 Newcourt – Skibbereen Scheme NCS At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N71 Bandon Pedestrian Crossing At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N72 Sandpit Cross Scheme At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N72 Forge Cross Scheme At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N20 Local Access Study (Blarney to Rathduff) At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N73 Annakisha Bridge Realignment Scheme At Design
View
Map:
Status:At Design
Tender Award Date:
On Site:
Estimated Time for completion:
Completed On:
Road Closure:
Diversion Route:
Speed Limit:
Speed applicable on site:
Dates Applicable:
Contractor:
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N20 Buttevant Town Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:n/a
Start on site:n/a
Completion Date:n/a
Speed Limit Reduction in place:n/a
Diversion:n/a
N25 Castlemartyr Traffic Calming – Phase 2 At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:n/a
Start on site:n/a
Completion Date:n/a
Speed Limit Reduction in place:n/a
Diversion:n/a
N71 – Emergency Repairs Contract At Design
View
Map:
Status:At Design
Tender Award Date:N/A
On Site:N/A
Estimated Time for completion:N/A
Completed On:N/A
Road Closure:N/A
Diversion Route:N/A
Speed Limit:N/A
Speed applicable on site:N/A
Dates Applicable:N/A
Contractor:N/A
Design required:N/A
Start on site:N/A
Completion Date:N/A
Speed Limit Reduction in place:N/A
Diversion:N/A
N71 – Clonakility Town Overlay On Site
View
Map:
Status:On Site
Tender Award Date:N/A
On Site:N/A
Estimated Time for completion:20 Weeks
Completed On:N/A
Road Closure:N
Diversion Route:N/A
Speed Limit:N/A
Speed applicable on site:N/A
Dates Applicable:N/A
Contractor:Mid Cork
Design required:N/A
Start on site:N/A
Completion Date:N/A
Speed Limit Reduction in place:N
Diversion:N/A
N72 – Ballyhooly Traffic Calming On Site
View
Map:
Status:On Site
Tender Award Date:
On Site:
Estimated Time for completion:4 Weeks
Completed On:
Road Closure:N
Diversion Route:
Speed Limit:N
Speed applicable on site:
Dates Applicable:
Contractor:Pat O'Donovan
Design required:
Start on site:01-03-2012
Completion Date:01-04-2012
Speed Limit Reduction in place:N
Diversion:Yes
N72 – Ballymaquirke Junction Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N72 – Fermoy Traffic Calming On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:4 Weeks
Completed On:n/a
Road Closure:N
Diversion Route:n/a
Speed Limit:N
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Pat O'Donovan
Design required:n/a
Start on site:n/a
Completion Date:n/a
Speed Limit Reduction in place:N
Diversion:n/a
N71 – Rosscarbery Pedestrian Crossing On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:20 Weeks
Completed On:n/a
Road Closure:N
Diversion Route:n/a
Speed Limit:N
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Mid Cork
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:N
Diversion:
N71 – Lamb Street Lower, Clonakilty Scheme On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:20 Weeks
Completed On:n/a
Road Closure:N
Diversion Route:n/a
Speed Limit:N
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Mid Cork
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:N
Diversion:
N71 – Parkana Bridge Scheme On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N71 – Newtown Safety Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N25 – Castlemartyr Traffic Calming At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 – Inchinashingane Safety Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N20 – Rathduff Traffic Calming On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:16 Weeks
Completed On:n/a
Road Closure:N
Diversion Route:n/a
Speed Limit:Y
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Lagan
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:Y
Diversion:
N73 – Clogher Cross – Waterdyke Realignment Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N73 – Annakisha South Realignment Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N72 – Carrig Bridge Realignment Scheme On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:6 Months
Completed On:n/a
Road Closure:Y
Diversion Route:n/a
Speed Limit:N
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:McGinty O'Shea
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:N
Diversion:
N20 – Buttevant to Lisballyhay Realignment Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N72 – Castletownroche to Ballyhooly Overlay Scheme – Phase 1 At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N71 – Ballydehob to Aghadown Overlay Scheme At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 – Lynch’s Cross to Macroom Overlay Scheme On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:10 Weeks
Completed On:n/a
Road Closure:Y
Diversion Route:n/a
Speed Limit:Y
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Roadstone Wood
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:Y
Diversion:
N20 – Rathduff Overlay Scheme On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:16 weeks
Completed On:n/a
Road Closure:N
Diversion Route:n/a
Speed Limit:Y
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:Lagan
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:Y
Diversion:
N28 – Ringaskiddy Traffic Calming On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N28 – Bloomfield – Ringaskiddy Scheme On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N25 – Sarsfield Road Bandon Road Interchanges On Site
View
Map:
Status:On Site
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N25 – Dunkettle Interchange At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N25 – Carrigtwohill Midleton Interchanges On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 – Ovens to Ballyvourney On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 – Northern Ring Road On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
N22 – Baile Buirne to Macroom At Design
View
Map:
Status:At Design
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:
M20 – Cork Limerick Motorway Scheme On Hold
View
Map:
Status:On Hold
Tender Award Date:n/a
On Site:n/a
Estimated Time for completion:n/a
Completed On:n/a
Road Closure:n/a
Diversion Route:n/a
Speed Limit:n/a
Speed applicable on site:n/a
Dates Applicable:n/a
Contractor:n/a
Design required:
Start on site:
Completion Date:
Speed Limit Reduction in place:
Diversion:

Completed Schemes

Status

Information

Map

N20 Annabella Overlay Scheme Completed View
N20 Castleland – Buttevant Overlay Scheme Completed View
N71 Ballinascarthy Overlay Scheme Completed View
N73 Kildorrery – Scart Overlay Scheme KSO Completed View
N22- Road widening at Ballymakeera Completed View
N71 – Emergency Repairs Contract At Design View
N71 – Chetwynd Dual Carriage (Inbound) Completed View
N73 – Oliver Cross to Kildorrery Completed View
N72 – Dromagh – Ballymaquirk Completed View
N72 – Rathmore Cullen Completed View
N71 – Glengarrif Ballylickey Bantry Completed View
N71 – Glengarriff Pedestrian Crossing Completed View
N71 – Derrycreigh Safety Scheme Completed View
N72 – Carrig – Castletownroche Realignment Scheme Completed View
N72 – Carrig Bridge Realignment Scheme On Site View
N72 – Ballyhooly to Fermoy Overlay Scheme – Phase 1 Completed View
N72 – Castletownroche to Ballyhooly Overlay Scheme – Phase 1 At Design View
N71 – Newmills to Lisavaird Overlay Scheme Completed View
N71 – Skibbereen to Rosscarbery Overlay Scheme (Phase 1, 2 etc) Completed View
N71 – Ballydehob to Aghadown Overlay Scheme At Design View
N71 – Drumaclarig to Glengarriff Overlay Scheme Completed View
N22 – Lynch’s Cross to Macroom Overlay Scheme On Site View
N20 – Rathduff Overlay Scheme On Site View
N71 – Holyhill – Lisheen Completed View
N71 Clonakilty – Lisavaird Completed View
N25 – Killeagh Youghal Completed View
N72 – Kippagh – Longueville Completed View
N71 – Bandon Inishannon Overlay Completed View
N71 – Chetwynd Viaduct Dual Carraigeway Completed View
N25 – Castlemartyr Traffic Calming Phase 1 & Castlemartyr/Midleton Overlay Completed View
N25 – Midleton to Youghal Road Improvement Scheme Completed View
N8 - Fermoy - Mitchelstown SchemeCompleted View
N8 - Fermoy Town EnhancementCompleted View
N8 - Mitchelstown Relief RoadCompleted View
N8 - Rathcormac Fermoy BypassCompleted View
N20 - 2 Plus 1 RathduffCompleted View
N25 - Kinsale Road RoundaboutCompleted View
N22 - Macroom Traffic CalmingCompleted View
N25 - Burges Cross OverlayCompleted View
N28 - Bloomfield - Ringaskiddy SchemeCompleted View
N71 - Glengarriff Pedestrian CrossingCompleted View
N71 - Derrycreigh Safety SchemeCompleted View