The proposed works are located on the N20 National Primary Route from the Annabella Roundabout in
Mallow to a point approximately 2km south of this. A temporary roadworks speed limit of 60km/hr will be in operation on both carriageways of the N20, from its junction with the R638 in Quartertown Upper to a point 150m south of the Annabella Roundabout.
The overlay works include the removal of failed sections of pavement, subsequent strengthening of these sections and resurfacing with bituminous macadam. Works also include storm water drainage, new footpaths and kerbs, tree surgery, roadside drainage works, traffic signs and road markings and traffic management.
The bridge rehabilitation works include the replacement of the existing parapet and installation of a new vehicle restraint system in the North bound lane.
It is anticipated that the scheme will be substantially complete by mid-June 2020, however this timeline is weather dependent and given the complex nature of these works, delays may be encountered and this date may be subject to change.